ENGINEERING TO CONNECT THE FUTURE

Great connections
start with
a solid foundation.

Site acquisition, permitting and technical reports. Engineering for every stage of telecommunications infrastructure.

FROM FEASIBILITY TO TECHNICAL DOCUMENTATION.Radio base station (telecommunications tower) · conceptual image
AN INTEGRATED VIEW
OF YOUR DEVELOPMENT.

The right location.
Site Acquisition

The regulatory path.
Permitting

Technical assessment.
Reports with ART

FROM THE TERRAIN TO AN AERIAL VIEW

Information for planning.
Support for regularization.

Drone services, land surveying and property and land regularization, with a scope tailored to your needs.

02 — ABOUT ALL ERB

Behind every connection,
there is engineering.

ENGINEERING & TELECOM

Infrastructure requires more than a good starting point. It requires understanding what comes next.

ALL ERB works in engineering and permitting for telecommunications, with site acquisition services and technical reports.

Location, documentation and development conditions guide the definition of the work. An initial conversation helps turn your requirements into a clear scope.

Let us understand your requirements
FROM THE FIRST CONTACT
TO THE NEXT STEP.
01

Understand the context

Location, objective and current stage of the development.

02

Define the scope

Activities and deliverables aligned with the project's needs.

03

Guide the enquiry

Referral for the appropriate technical assessment.

FOR PROPERTY OWNERS

Your property could be
the start of a
new connection.

Do you have land, a rooftop or a building? Share its characteristics for an initial assessment of interest and feasibility.

Submit your property Submission does not guarantee a lease or a contract.
03 — BEFORE GETTING STARTED

A good conversation
starts with clarity.

Some information helps guide
assistance from the very first contact.

What should I provide to start an enquiry?

The service you are interested in, the city and the stage of the development. If there is a specific documentation or assessment requirement, describe it in your message.

How are the scope and timelines defined?

The scope is defined in the technical proposal after understanding the requirements. Timelines depend on the project characteristics, documentation and applicable processes.

Do the reports include ART?

Lightning protection, sound pressure and radiometric report services include technical responsibility with ART according to the contracted scope. Details are agreed in the technical proposal.

How can I submit a property?

Open Property Submission and provide the city, property type, approximate area and a brief description. You do not need to send personal documents at this first stage.

ALL ERB IN GOIÂNIA

Where we are.

R. C-135, 455 — QD 279 LT 01, Sala 07
Jardim América, Goiânia — GO
Postal code 74275-040
Open directions in Google Maps (opens in a new tab)
WHAT IS YOUR NEXT PROJECT?

Let us build
that connection.

Talk to ALL ERB